Super-Kamiokande Upgrade July-Sep. 2001 photos

The following pictures are 800x600 (or 600x800) format if you click on the apropriate thumbnails. Higher resolution versions of these pictures (1280x960 / 960x1280) are available here or by request via email to berns@phys.washington.edu.

More photos will probably be added during the next weeks.
Enjoy.


preparing for work inside SK tank

A new OD PMT lowered into top layer of the tank via hoist

Monica and Dan(?) taking new OD PMT from hoist

Jeff and Monica using a glowring for splice shink tubing

zoom of glowring shrink tubing

Erik and Dan bolting a new OD PMT on top layer

glowring action finished

Jeff showing the final shrink tube splice

Mark, Bill and Nakahata at the OD entrance

Erik and Jeff operating the gondola at the OD entrance

Dan in a boat in the OD section

Erik and Jeff in gondola reaching the water level

Erik and Jeff in gondola [no flash]

Erik waiting in boat & hoist operation [no flash]

Markus, Charlotte and Jeff in gondola [no flash]

Markus, Charlotte and Jeff in gondola near water level

Jeff and Charlotte in boat preparing wall PMT work

Jeff and Charlotte in boat [no flash]

Jeff showing cut&stripped coax cable of wall PMT

view into OD wall section underwater [no flash]

coax cable stripper tool in action

Jeff attaching SHV connector to coax cable

Jeff showing Charlotte how to use the glowring

more glowring in action

zoom of glowing in action

Jeff finalizing the second shrink tube layer

Jeff and Charlotte adding a tyvek patch

HGB bolting a wall PMT

view up OD wall from P06 horizontal layer

Gene and Megumi (in supply boat) working on wall PMT

Gene and Megumi at wall PMT

view inside a wall supermodule (back of 20" ID PMT)

Jeff, Dan and Dan working on another wall PMT

BBQ 8/3/01 at SK dormitory backyard

BBQ 8/3/01: Gene & Koshio-san

BBQ 8/3/01: beer & food ready

BBQ 8/3/01: waiting for yakiniku

BBQ 8/3/01: Monica

BBQ 8/3/01: Gene, Charlotte & Fermin(?) at yakisoba grill

BBQ 8/3/01: Charlotte & what's left of the yakisoba

BBQ 8/3/01: more meat on the grill

BBQ 8/3/01

BBQ 8/3/01: Megumi

BBQ 8/3/01: (tall) Dan & Markus

view into inner detector 8/6/01 [no flash]

view into inner detector

SUNY crew (Sarah, Evan, Constantinos, Arrash) preparing new wave-shifter plate

Arrash putting an old PMT away for storage

new PMTs waiting for delivery to the boats

view into outer detector 8/6/01 [no flash]

Matt in gondola, and Fumi standing by

snapshot from ID TV camera

TV monitor next to ID gondola entrance

Mark & Michael doing hut check

another view into the inner detector

Fumi & Charlotte at the ID TV monitor

Sakuda doing the ID hut task

Markus, Damien & Fumi attaching a new PMT to the hoist

Damien, Markus, Magumi & Fumi at the hoist

Matt moving a new PMT to the gondola

Gondola into ID area

Floating pads for ID work

Floating pads for ID work

Boat inside ID tank (photographers)

Photo opportunity inside ID tank (water at half level)

part of the US crew on foam platform in ID area

Gondola inside ID area

US crew group photo op.

US crew group photo op.

US crew group photo op.

HGB inside ID area

Monica, Charlotte, HGB inside ID area

Gondola opening between top ID PMTs

view from gondola again

ID PMT top layer near gondola opening

Kiyoko (US group's secretary)

Grafitti in OD column 10 layer P00 (we know who did it!)

Jordan and Matt in boat inside OD

OD PMT with bubble in glass (new W2M01P17A)

same OD PMT, different viewpoint

Dan shrinkwrapping with glowring tool

20" PMT arrangement in top ID layer

same (slightly different viewpoint)

close-up of a 20" PMT

reflection on 20" PMT glass (see the inner detector and water level?)

ID top PMTs viewed from below

working platform in ID [no flash]

working platform in ID

wall PMTs in ID section at water level

foam platforms joined together

boat (unused) along a wall section in the ID

loose optical fiber at tank wall at column P12, row M04

same optical fiber, with diffuser tip at end (brittle)

fiber mounting plate still under water

next day, after water level lowered by 1 SMT: fiber mounting plate now dry

loose optical fiber end re-attached to mounting plate (note: diffuser tip broke off; was very brittle)

greeting notes behind a wave-shifter plate from 1995 (from original construction phase)

Jeff & Clark in gondola

Matthew, Jeff, Clark in gonola going downwards

... now at M08 layer (lowest barell layer just above tank bottom)

same as before [no flash]

ID 20" tube preparation

ID 20" tube preparation

material stacked near the center hut; 2 OD boats taken out again after barrel replacement is finished

mobile 120V AC / 600W supply (batteries & inverter in suitcase) for heatshrink operations in boat

rechargers for mobile US equipment (radios, drills, coax strippers,...)

Bill working on a removed flooded PMT

zoom of the flooded PMT (the water inside is probably toxic now)

Gondola problems - power cable got tangled at the frame and pulled out of its connection box...

Dusan, Shantanu, Wei stapling tyvek sheets in OD bottom section

tyvek stapling (Fred?)

Wei and Fred (?) at tyvek stapling

view into OD wall section at the tank bottom (before tyvek finishing)

view from tank bottom up a OD wall

OD tyvek people (Chris, Ben, and others)

airlock at bottom entrance hole (in OD section at column 22)

man hole entrance at tank bottom

foam pads for ID work stored next to opening in OD bottom section

Jim and Hank adding wires at tank wall to secure tyvek sheets

bent screw found at OD PMT# W1M08P01A

view into supermodules at bottom (ID tubes facing up, OD tubes facing down)

another view into supermodules

view into ID bottom section with foam pads laying onto the PMTs

walking on the pads on ID bottom

foam pressing onto the ID PMTs

bright lights (with red filters) in ID top section

professional photograher at work in ID

nice reflection of entire ID in bottom ID PMT

Ben and Wei tyvekking at the tank bottom

example of a new bottom OD PMT

Fred in OD bottom section at cleanup work

final tyvek layout in bottom OD section

Bob Mitiguy with tyvek suit and hardhat at tank bottom

Hans at tank bottom

overflow hoses at tank bottom center

one of the water pressure relief hoses

final tyvek layout at tank bottom at the wall

piping parts for work by Mitsui Company

remaining section to be worked on as of 9/13/01

outside airlock and shoe change area at tank bottom entrance

"greetings" left on tyvek at tank bottom during 1995/96 construction

water flow test at tank bottom (2 of 4 pipes shown)

another of the 4 water inlet pipes at the tank bottom

group picture at tank bottom 9/15: Chris, Bill, Jeff, Bob, Matthew, Shantanu

almost same group picture; now Hans in picture and Bob behind the camera

one of the 14 bottom section optical fibers of the OD laser calibration system (note: the diffuser cap is missing here)
       

Other SK Upgrade photos are available at:


[Super-K US Collaboration Home Page]   [Kamioka Observatory Home Page]
posted/updated 8 Oct. 2001 by H.G.Berns