More photos will probably be added during the next weeks.
Enjoy.
 preparing for work inside SK tank |
 A new OD PMT lowered into top layer of the tank via hoist |
 Monica and Dan(?) taking new OD PMT from hoist |
 Jeff and Monica using a glowring for splice shink tubing |
 zoom of glowring shrink tubing |
 Erik and Dan bolting a new OD PMT on top layer |
 glowring action finished |
 Jeff showing the final shrink tube splice |
 Mark, Bill and Nakahata at the OD entrance |
 Erik and Jeff operating the gondola at the OD entrance |
 Dan in a boat in the OD section |
 Erik and Jeff in gondola reaching the water level |
 Erik and Jeff in gondola [no flash] |
 Erik waiting in boat & hoist operation [no flash] |
 Markus, Charlotte and Jeff in gondola [no flash] |
 Markus, Charlotte and Jeff in gondola near water level |
 Jeff and Charlotte in boat preparing wall PMT work |
 Jeff and Charlotte in boat [no flash] |
 Jeff showing cut&stripped coax cable of wall PMT |
 view into OD wall section underwater [no flash] |
 coax cable stripper tool in action |
 Jeff attaching SHV connector to coax cable |
 Jeff showing Charlotte how to use the glowring |
 more glowring in action |
 zoom of glowing in action |
 Jeff finalizing the second shrink tube layer |
 Jeff and Charlotte adding a tyvek patch |
 HGB bolting a wall PMT |
 view up OD wall from P06 horizontal layer |
 Gene and Megumi (in supply boat) working on wall PMT |
 Gene and Megumi at wall PMT |
 view inside a wall supermodule (back of 20" ID PMT) |
 Jeff, Dan and Dan working on another wall PMT |
 BBQ 8/3/01 at SK dormitory backyard |
 BBQ 8/3/01: Gene & Koshio-san |
 BBQ 8/3/01: beer & food ready |
 BBQ 8/3/01: waiting for yakiniku |
 BBQ 8/3/01: Monica |
 BBQ 8/3/01: Gene, Charlotte & Fermin(?) at yakisoba grill |
 BBQ 8/3/01: Charlotte & what's left of the yakisoba |
 BBQ 8/3/01: more meat on the grill |
 BBQ 8/3/01 |
 BBQ 8/3/01: Megumi |
 BBQ 8/3/01: (tall) Dan & Markus |
 view into inner detector 8/6/01 [no flash] |
 view into inner detector |
 SUNY crew (Sarah, Evan, Constantinos, Arrash) preparing new wave-shifter plate |
 Arrash putting an old PMT away for storage |
 new PMTs waiting for delivery to the boats |
 view into outer detector 8/6/01 [no flash] |
 Matt in gondola, and Fumi standing by |
 snapshot from ID TV camera |
 TV monitor next to ID gondola entrance |
 Mark & Michael doing hut check |
 another view into the inner detector |
 Fumi & Charlotte at the ID TV monitor |
 Sakuda doing the ID hut task |
 Markus, Damien & Fumi attaching a new PMT to the hoist |
 Damien, Markus, Magumi & Fumi at the hoist |
 Matt moving a new PMT to the gondola |
 Gondola into ID area |
 Floating pads for ID work |
 Floating pads for ID work |
 Boat inside ID tank (photographers) |
 Photo opportunity inside ID tank (water at half level) |
 part of the US crew on foam platform in ID area |
 Gondola inside ID area |
 US crew group photo op. |
 US crew group photo op. |
 US crew group photo op. |
 HGB inside ID area |
 Monica, Charlotte, HGB inside ID area |
 Gondola opening between top ID PMTs |
 view from gondola again |
 ID PMT top layer near gondola opening |
 Kiyoko (US group's secretary) |
 Grafitti in OD column 10 layer P00 (we know who did it!) |
 Jordan and Matt in boat inside OD |
 OD PMT with bubble in glass (new W2M01P17A) |
 same OD PMT, different viewpoint |
 Dan shrinkwrapping with glowring tool |
 20" PMT arrangement in top ID layer |
 same (slightly different viewpoint) |
 close-up of a 20" PMT |
 reflection on 20" PMT glass (see the inner detector and water level?) |
 ID top PMTs viewed from below |
 working platform in ID [no flash] |
 working platform in ID |
 wall PMTs in ID section at water level |
 foam platforms joined together |
 boat (unused) along a wall section in the ID |
 loose optical fiber at tank wall at column P12, row M04 |
 same optical fiber, with diffuser tip at end (brittle) |
 fiber mounting plate still under water |
 next day, after water level lowered by 1 SMT: fiber mounting plate now dry |
 loose optical fiber end re-attached to mounting plate (note: diffuser tip broke off; was very brittle) |
 greeting notes behind a wave-shifter plate from 1995 (from original construction phase) |
 Jeff & Clark in gondola |
 Matthew, Jeff, Clark in gonola going downwards |
 ... now at M08 layer (lowest barell layer just above tank bottom) |
 same as before [no flash] |
 ID 20" tube preparation |
 ID 20" tube preparation |
 material stacked near the center hut; 2 OD boats taken out again after barrel replacement is finished |
 mobile 120V AC / 600W supply (batteries & inverter in suitcase) for heatshrink operations in boat |
 rechargers for mobile US equipment (radios, drills, coax strippers,...) |
 Bill working on a removed flooded PMT |
 zoom of the flooded PMT (the water inside is probably toxic now) |
 Gondola problems - power cable got tangled at the frame and pulled out of its connection box... |
 Dusan, Shantanu, Wei stapling tyvek sheets in OD bottom section |
 tyvek stapling (Fred?) |
 Wei and Fred (?) at tyvek stapling |
 view into OD wall section at the tank bottom (before tyvek finishing) |
 view from tank bottom up a OD wall |
 OD tyvek people (Chris, Ben, and others) |
 airlock at bottom entrance hole (in OD section at column 22) |
 man hole entrance at tank bottom |
 foam pads for ID work stored next to opening in OD bottom section |
 Jim and Hank adding wires at tank wall to secure tyvek sheets |
 bent screw found at OD PMT# W1M08P01A |
 view into supermodules at bottom (ID tubes facing up, OD tubes facing down) |
 another view into supermodules |
 view into ID bottom section with foam pads laying onto the PMTs |
 walking on the pads on ID bottom |
 foam pressing onto the ID PMTs |
 bright lights (with red filters) in ID top section |
 professional photograher at work in ID |
 nice reflection of entire ID in bottom ID PMT |
 Ben and Wei tyvekking at the tank bottom |
 example of a new bottom OD PMT |
 Fred in OD bottom section at cleanup work |
 final tyvek layout in bottom OD section |
 Bob Mitiguy with tyvek suit and hardhat at tank bottom |
 Hans at tank bottom |
 overflow hoses at tank bottom center |
 one of the water pressure relief hoses |
 final tyvek layout at tank bottom at the wall |
 piping parts for work by Mitsui Company |
 remaining section to be worked on as of 9/13/01 |
 outside airlock and shoe change area at tank bottom entrance |
 "greetings" left on tyvek at tank bottom during 1995/96 construction |
 water flow test at tank bottom (2 of 4 pipes shown) |
 another of the 4 water inlet pipes at the tank bottom |
 group picture at tank bottom 9/15: Chris, Bill, Jeff, Bob, Matthew, Shantanu |
 almost same group picture; now Hans in picture and Bob behind the camera |
 one of the 14 bottom section optical fibers of the OD laser calibration system (note: the diffuser cap is missing here) |
|
|
|
|