Our
current projects (not in any particular
order)
- Documentation (HOW-TOs/FAQs)
- Backups (Multi-department Tape Library System)
- New scheduler for Astronomy cluster
- Graduate student
database for front office
- Astronomy SAN Implementation
- Server and Network Monitoring System
- New collaborative
mail server (Zimbra or Outlook)
- VPN (Accessing data from wireless securely and simply)
- GridFTP
implementation for Astronomy
- LDAP Upgrade (new hardware and better software)
- PAB networking upgrade (new switches to replace 8 year old
building switches)
- 10 Teraflop cluster proposal for INT
- Condor upgrade for Astronomy, Condor implementation for INT
- INT print server, file server, and Access Grid node
- Upgrade trouble ticketing system
- Service level agreement with the departments
Projects
completed by PACS Team
<>- Faculty workstation initiative desktops
- SPAM control and mail server upgrade (greylisting spam
assassin)
- Physics shop upgrades (upgrade of workflow software, new
servers, new desktops)
- Physics classroom lab upgrades (new desktops, new software)
- Server room upgrades (cooling, power, and organization)
- RedHat 4 upgrades
- Helped graduate students with 2007 STF proposals
|